EPG has established up a total established of good quality administration system which is offered with sophisticated inspection and examination equipment. In the meantime, our goods are manufactured according to large high quality expectations, and complying with the global innovative common standards. We examine every single piece of bearing by ourselves ahead of supply.
RV series Attributes
- RV – Dimensions:030-040-050-063-075-a hundred and five-a hundred and ten-one hundred thirty-a hundred and fifty
- Input Choices: with enter shaft, With Square flange,With Input Flange
- Enter EPT .06 to 11 kW
- RV-Dimensions from 030 to 105 in die-cast aluminium alloy budy and above 110 in solid iron
- Ratios among 5 and one hundred
- Max torque 1550 N.m and admissible output radial masses max 8771 N
- Aluminium models are provided full with artificial oil and let for EPT mounting positions, with no need to modify lubricant amount
- Worm wheel: Copper (KK Cu).
- Loading capability in accordance with: ISO 9001:2015/GB/T 19001-2016
- Measurement 030 and over are painted with RAL 5571 blue
- Worm EPT EPTs are available with diffferent mixtures: NMRV NMRV, NMRVEPT NMRV, JWB NMRV
- NMRV, NRV VS,NMRV AS,NMRV VS,NMRV F
- Alternatives: torque arm, output flange, viton oil seals, minimal/high temperature oil, filling/drain/breather/level plug,Small hole
Fundamental versions can be utilized to a vast selection of EPT reduction ratios from 5 to 1000.
Guarantee: 1 year from date of supply.
WORM EPT | |||||
SNW Series | Output Velocity Range: | ||||
Sort | Aged Sort | Output Torque | Output Shaft Dia. | 14rpm-280rpm | |
SNW030 | RV030 | 21N.m | phi14 | Relevant EPT EPT: | |
SNW040 | RV040 | 45N.m | phi19 | .06kW-11kW | |
SNW050 | RV050 | 84N.m | phi25 | Input Options1: | |
SNW063 | RV063 | 160N.m | phi25 | With Inline AC EPT | |
SNW075 | RV075 | 230N.m | phi28 | Input Options2: | |
SNW090 | RV090 | 410N.m | phi35 | With Square flange | |
SNW105 | RV105 | 630N.m | phi42 | Enter Options3: | |
SNW110 | RV110 | 725N.m | phi42 | With Input Shaft | |
SNW130 | RV130 | 1050N.m | phi45 | Input Options4: | |
SNW150 | RV150 | 1550N.m | phi50 | With Input Flange |
EPT Generate
ZheJiang EPT Travel Co.,Ltd,the predecessor was a point out-owned army mould EPTrprise, was estabEPTd in 1965. EPT EPTizes in the full EPT EPT remedy for substantial-finish tools producing EPT based on the goal of quotPlatform Item, Software Layout and Specialist Provider quot.
EPT have a sturdy complex drive with more than 350 personnel at existing, incXiHu (West Lake) Dis.Hu (West Lake) Dis. more than 30 engineering experts, 30 high quality inspectors, masking an location of 80000 sq. meters and types of EPT processing EPTs and testing equipments. We have a good basis for the market application deveXiHu (West Lake) Dis.Hu (West Lake) Dis.ment and services of higher-conclude pace EPTs amp variators possessing to the provincial engineering EPT research cEPTr,the lab of EPT pace EPTs, and the base of modern day R ampD.
Our Staff
EPT Manage
EPT:Insist on EPTrovement,Try for Excellence With the deveXiHu (West Lake) Dis.Hu (West Lake) Dis.ment of equipment producing indurstry,customer by no means satirsfy with the current good quality of our products,on the contrary,wEPT the benefit of top quality.
EPT plan:to improve the general stage in the discipline of EPT EPT
EPT View:Continuous EPTrovement , pursuit of excellence
EPT Philosophy:EPT EPTs benefit
3. Incoming EPT Management
To create the AQL suitable amount of incoming material manage, to supply the material for the EPT inspection, sampling, immunity. On the acceptance of qualified goods to warehousing, substXiHu (West Lake) Dis.Hu (West Lake) Dis.rd goods to take return, check out, rework, rework inspection accountable for monitoring bad, to monitor the provider to take corrective measures
to prevent recurrence.
four. Process EPT Manage
The production site of the 1st examination, inspection and closing inspection, sampling in accordance to the needs of some initiatives, judging the good quality adjust development
discovered irregular phenomenon of manufacturing, and supervise the creation department to increase, get rid of the abnormal phenomenon or state.
5. FQC(Final QC)
Soon after the manufacturing section will total the product, stand in the customer’s position on the completed item top quality verification, in buy to make sure the top quality of
consumer anticipations and needs.
six. OQC(Outgoing QC)
Right after the merchandise sample inspection to deterEPT the competent, enabling storage, but when the finished merchandise from the warehouse before the formal supply of the goods, there is a examine, this is called the shipment inspection.Check articles:In the warehouse storage and transfer status to validate, even though confirming the delivery of the solution
is a product inspection to deterEPT the experienced merchandise.
EPT
Shipping and delivery